If a client will not sign the estimate, send it again on day 3, ask for a signature or a no on day 7, and close it on day 14. Do not start the work. Nothing else in the invoice library applies yet, because there is no job to bill and no invoice to chase.
A quote nobody answered is a different sequence, in how to follow up on a quote. This one is for the estimate that is sitting in their inbox unsigned, often after they said it "looks fine." If you are not sure the document was a firm price, read estimate versus quote versus proposal before you ask them to sign it. If the unsigned file is a repaint priced by room and coats, resend the painting estimate generator PDF, not a new price typed into the email.
I do not open the working file until the estimate is signed. The awkward email is cheaper than a week of work I then have to discount.
Day 3: resend the document
Hi [Client name], The estimate for [project name] is attached again. The total is [amount]. A [deposit percent] deposit of [deposit amount] is due when you sign. The balance is due [payment terms]. It is valid until [expiry date]. I will start on [start date] once it is signed. Reply with a signature, or tell me what to change and I will send a revised file. [Your name]
The total is in the email so they do not have to open the PDF to remember the number. The start date is conditional. "Once it is signed" is the whole policy.
Day 7: yes or no
Hi [Client name], Checking on the estimate from [date] for [project name], total [amount]. I am holding [start date] through [hold until date]. If I do not have a signature by then, I will release the date. A yes, a no, or a change request are all fine. I will not start without one of those. [Your name]
Releasing the date is a real consequence only if you mean it. If the calendar was never held, delete that sentence. A fake hold is how the next email loses its nerve.
Day 14: close it
Hi [Client name], I am closing the estimate from [date] for [project name], total [amount]. It has expired. If you want to go ahead later, reply and I will send a new estimate with a new date. The old file is not open. [Your name]
Do not add a discount in this note. Do not apologize for closing a document they did not sign. A later yes gets a new PDF from the estimate generator, with the deposit and the payment terms printed on it before anyone starts.
If they ask for a change
Hi [Client name], Attached is a revised estimate for [project name]. The change is [one line]. The new total is [amount]. The previous estimate from [date] is replaced and should not be signed. I will start when this version is signed. It is valid until [expiry date]. [Your name]
One change, one new total, one file. If they keep editing, you are not in a chase anymore. You are in a scope conversation, and the next email should be a new estimate, not a fourth reminder. The deposit, if you use one, is described in what deposit to charge. It is due on acceptance, not on a hopeful Tuesday.
An estimate sent on 2 March
You sent a $6,400 estimate on Monday 2 March, with a 50 percent deposit of $3,200 due on signature. Day 3 is Thursday 5 March. Day 7 is Monday 9 March. Day 14 is Monday 16 March. The close goes out on the 16th. A "looks good" on the 10th that does not sign, and does not name $6,400, does not start the job. You reply the same day with the revised-or-sign email, and the clock for a close does not disappear just because they were polite.
Half of $6,400 is $3,200. That deposit is not invoiced on the 5th to hurry them. It is invoiced when the signature exists. If they sign on the 18th, after you closed the file on the 16th, they get a new estimate. The old $6,400 is not silently revived if your dates moved. Say the old file is void in the same email as the new PDF.
The hold on your calendar is only a hold if you would actually give the date to someone else. If you would not, do not write that you are holding it. A date you were never going to release is a threat with no teeth, and the day-7 email depends on being believed.
What has to be on the PDF before you chase it
A chase for a signature fails when the file itself is vague. Before the day-3 email, the estimate should name the work, the total, the deposit, the start condition, and the date the price expires. On the $6,400 file that is $3,200 to start, the sentence is: work begins when this estimate is signed and the $3,200 is paid. If those words are missing, you are asking them to sign a price with no start rule, and "looks good" will feel like enough to them.
Do not paste the whole estimate into the follow-up email. Attach the same PDF and name the total in the first line, so they can answer from a phone. A new total means a new file. Editing the old PDF and resending it under the same date is how two versions end up signed, and you will not know which one they meant. If the expiry date has already passed by day 14, the close email should say the price is no longer open, not that you are still holding $6,400 for them. Say that in the close, and take the old PDF down.
Keep reading
- If they never replied at all, use the quote sequence instead of this one.
- Make sure the document you are chasing is actually a price you can sign.
- The deposit belongs on the estimate, and it is due when they accept it.